Venue Installation and Commissioning - TSA installs, load-tests and commissions whole-venue stage systems to a documented handover, Australia wide
Installed by the team that engineered it.
Hoists, bars, grids, track and control set in place, load-tested and commissioned to a documented handover - sequenced around your calendar, Australia wide. We've got your venue.
Three ways the
install lands.
A whole staging environment, the stage-machinery scope inside a builder's programme, or one system into a working building - the same discipline covers all three. Wherever we plug in, one party owns the interfaces, the load paths and the handover.

Full system install
- Hoists and bars
- Grids and track
- Acoustics and control
The whole staging environment - hoists, bars, grids, track, acoustics and control - designed and delivered as one programme under one party.

Package in a builder's programme
- Head contract
- Documented interfaces
TSA takes the stage-machinery scope under your head contract, with the interfaces to the building trades documented and owned.

Single system, working venue
- One system
- Live calendar
One system added around a live calendar. A rigging system going into an existing grid? Rigging Installation covers the detail.

Set in place.
Proven under load.
Venue installation is TSA setting a building's stage machinery in place and proving it, by the team that engineered it. One party carries the programme from site survey to sign-off, Australia wide: one relationship for your venue, not several vendor interfaces.
What goes in
- Hoists and lighting bars
- Pipe grids
- Curtain track
- Acoustic banners
- The control that runs them
Delivered as one environment
- Cairns Convention Centre Great Hall: a 36-axis hoist array with 42 metres of box truss
- A multi-studio broadcast facility: TV hoists, pile-hoist lighting bars, pipe grids and acoustic systems
This page covers whole-venue installs, fit-out to commission. A single rigging system into an existing grid? See Rigging Installation. Either way, you are already running a season, a term or a builder's programme: the install is engineered to land around it.
Four jobs, one install team.
Set by its engineers
The engineers who drew the load paths set the hoists, fly the bars and terminate the track - nothing is re-interpreted on site by a stranger to the design.
Sequenced around your season
A live season, a school term or a builder's programme is a constraint we engineer for - the dates are agreed before the first case rolls in.
One party, every trade
Lighting, audio, video and building trades all reach the same ceiling - and the interfaces between them are owned by one accountable party.
A handover you can run on
Documentation, certificates and operators trained to competency on the specific system - the building runs its own environment from the first show.
How the install runs.
One programme from survey to sign-off. The clashes surface on paper, where they cost a redraw - not during bump-in - and the dates hold because they were engineered, not hoped for.
-
Step 01
Site survey & early coordination
Load paths, interfaces and structural requirements resolved on paper before anything is fabricated - clashes surface in design, where they cost nothing.
-
Step 02
Engineering & drafting
In-house drafting with coordinated consultant engagement, taken through formal design-review milestones before fabrication begins.
-
Step 03
Supply & controlled fabrication
Systems built under quality-assurance oversight, with engineering verification and certification of every load-bearing element.
-
Step 04
Install & integration
Hoists set, bars flown, track and control integrated as one environment - the coordination across lighting, audio, video and building trades carried for you.
-
Step 05
Commissioning & documented handover
Load-tested, certified, documented and signed off - then your operators trained to competency on the system they now own.




Every system we install, in place.
The systems we set in place, shown in a working venue. Select a numbered pin to see what we install there, then open its page.

Set in place. Proven under load.
Lighting bar in place A rigged bar beside a tiered auditoriumAustralia wide
One programme, survey to sign-off. Australia wide.
One party carries the interfaces, the load paths and the handover.


Cairns Convention Centre
A 36-axis hoist array over a convention-centre Great Hall, engineered, installed, load-tested and handed over by one team.
Read the case study →Venues running
on our installs.
A 36-axis hoist array over a convention-centre Great Hall. A permanent show past 4,000 performances. A tertiary media centre delivered grid by grid. The installs hold because the handover does.
See all projects
36 hoists, one ceiling, one desk.
A 36-axis hoist array and 42 metres of box truss - the Great Hall's overhead staging installed and commissioned so the venue takes whatever build walks in.
Read the project
4,000 shows on one install.
Staging and automation installed for a permanent nightly show - seven-plus years of performances on the same commissioned system.
Read the project
A media centre, delivered at scale.
Install delivery scaled on a Perth tertiary media centre with a local Indigenous-owned partner crew - milestones hit, grid by grid.
Read the projectTell us the venue.
Whole-venue systems, installed and running.
Fly systems, seating, tracks and control installed across theatres and venues.
Questions
about venue installs.
If your question isn't here, tell us the venue and we'll come back with the right answer for your building.
Call 1300 439 872 →- Hoists and lighting bars
- Pipe grids
- Curtain track
- Acoustic systems
- The control layer that runs them
- The engineering behind the load-bearing elements
- Assumptions, interfaces and responsibilities recorded through design and installation
- Commissioning and load-test records
- Per-asset equipment certificates
Book the
install.
Tell us the venue, the systems and the dates. One team installs, load-tests and commissions to a documented handover - and trains your operators before we leave.
- We survey. Load paths and interfaces resolved on paper.
- We engineer. Drafting through formal design review.
- We commission. Load-tested, documented, operators trained.