Venue fit-outs and refurbishments - the whole staging environment designed, installed and commissioned by one team, Australia wide

Venue engineering · Fit-outs & refurbishments

Every system. Every interface. One team.

A venue fit-out from TSA is the whole staging environment - rigging, drapes and track, automation and electronics - installed and commissioned by one team, then handed over documented and signed off. One number to call, not multiple vendors to coordinate.

See our installs →

Or call 1300 439 872

Stage systems installed for venues around Australia
HOTA Home of the Arts Canberra Theatre Centre Brisbane Powerhouse Ipswich Civic Centre Gold Coast Convention and Exhibition Centre Arts Queensland National Gallery of Victoria WA Department of Local Government, Sport and Cultural Industries Griffith University University of Melbourne Queensland University of Technology Cairns Convention Centre Melbourne Olympic Park
Where we start

Start where
the building is.

A fit-out rarely starts from a clean sheet. Tell us where the building is - on the drawing board, half-built or mid-season - and we plug the programme in from there.

A hoist array hung over a large hall with truss and lines
A hoist array over a large hall

A new-build PAC

  • Design stage
  • Inside the construction programme

We come in alongside your architect and head contractor from design stage, delivering the stage-engineering package inside the construction programme.

Truss and hanging lines over a working concert hall with lit acoustic panels behind
Truss and lines over a working hall

A retrofit refurbishment

  • Around your season
  • Calendar keeps running

A working venue kept working - the install sequenced around your season so the systems change without the calendar stopping.

Two technicians working under flown lighting bars in a white studio
One white studio, battens at working height

A single-space upgrade

  • One space
  • Same standard

One studio, hall or stage inside a larger building, brought to the same engineered, documented, signed-off standard.

0+
Venues installed
0
In-house disciplines, one team
0
Identify, specify, deliver, maintain
AU
New-build to retrofit, Australia wide
Green and white perimeter drapes hung on track under a lighting grid in a film studio
Studio perimeter drapes Track-hung drapes under a lighting grid
What a fit-out is

Fit-out to commission,
one team.

A venue fit-out is the whole staging environment, designed, supplied, installed and commissioned by one team, then handed over documented and signed off. It is built for the people responsible for a building, not a show.

What a fit-out covers

  • Rigging and pipe grids
  • Drapes and track
  • Automation and control
  • The electronics behind them

Brought in-house over a decade

  • Track and drape installation
  • Automation
  • Electronics design
  • Scenic fabrication
  • Drape manufacturing

One party carries every system and every interface, so design intent survives from concept to commissioning with one accountable party. Load paths, interfaces and structural requirements are coordinated early, on paper, not discovered on site.

A building: start here

Venue managers, capital-works leads, architects and tier-one head contractors delivering a new performing arts centre or refurbishing a working venue.

Venue Engineering & Installation
A show: start at

Per-show engineering for productions, not buildings.

Production Engineering
5 disciplines in-house New-build to retrofit Load paths coordinated early Engineered & certified Documented handover
TSA crew setting numbered hoist battens to working height under an installed studio grid, cyclorama wall behind
Ceiling to floor, handed over as one environment. Installed hoist battens at working height in a multi-studio broadcast facility: grid, hoists, control and cyc wall commissioned together, then signed off.
What you get

Exactly what you asked for, ceiling to floor.

Four things a fit-out actually buys you - on the night the building opens, through the season after it, and ten years on.

It works on night one

Every axis load-tested, every cue proved, the room signed off before an audience is in it.

Your season keeps running

The install is sequenced around the calendar you have already published.

Built exactly as approved

Grid, hoists, track, drapes, control and the electronics behind them are drawn as one system, so the design you signed off is the room you walk into.

Still yours in year ten

Duty cycle, service access and spares are engineered in from concept, your operators are trained to competency at handover, and the documentation lands in a form the next venue manager can pick up and run.

The programme

Fit-out to commission.

Every fit-out runs the same documented programme, new-build PAC or working venue. Here is how a brief becomes a commissioned, signed-off staging environment.

Isometric cutaway render of Cairns Convention Centre showing the Great Hall grid, hoist array and box truss, the exhibition floor and the loading dock in one view
One building, read as one system. A cutaway of Cairns Convention Centre, where a 36-axis hoist array, 42 metres of five-chord box truss and the control that drives them were installed and commissioned over the Great Hall. Read the project.
  1. Phase 01

    Early coordination

    Load paths, interfaces and structural requirements resolved on paper with the architect, engineer and builder - not on site.

  2. Phase 02

    Informed design

    The staging environment designed as one system, with scenic and layout decisions shaped by automation and rigging constraints.

  3. Phase 03

    Drafting & design review

    In-house drafting, formal design-review milestones before fabrication - load-bearing elements verified and certified by engineering.

  4. Phase 04

    Fabrication & install

    Controlled fabrication under quality-assurance oversight, then installed and integrated on site by the team that engineered it.

  5. Phase 05

    Commission & handover

    Commissioned, signed off and handed over with structured documentation - and operators trained to competency on the systems they now own.

Lighting grid truss loaded with moving-light fixtures above a stage
Rigging and grids Truss loaded with moving lights above a stage
Numbered track carriers running along a curtain track
Drapes and track Track carriers numbered along a run
A TSA crew member in an orange vest at a hoist control rack with an emergency stop
Automation and control A TSA crew member at a hoist control rack
Atlas chain hoist controller resting on a flight case
The electronics A controller on a flight case
In the venue

What a fit-out
installs.

Grid, drapes, control and the electronics behind them, drawn and installed as one system. Select a numbered pin to see where each sits in the room.

Black-draped proscenium hall with line arrays and a lighting grid over tiered seating
On the job

Fit-out to commission, one team.

Venue rig in place Line arrays, grid and drapes over a tiered house
Raynok Micro G2 touch controller held in a technician's hand beside a hoist control rack.
Raynok control Cairns Convention Centre
A technician patching cables into a numbered road-case control rack.
Control rack patched and numbered
In the wings

A Great Hall that takes whatever walks in

Integrated overhead systems above a convention-centre stage, designed, installed and commissioned by one team.

Read the case study →
Start the conversation

Tell us about the building.

FAQ

Questions
about venue fit-outs.

If your question isn't here, talk to our team and we'll come back with the right answer for your building.

Call 1300 439 872 →
A whole staging environment, designed, supplied, installed, integrated and commissioned as one system:
  • Rigging, hoists and grids
  • Drapes and track
  • Automation and control
  • The electronics behind them
The engagement runs from early coordination of load paths and interfaces through in-house drafting, formal design reviews, controlled fabrication and install, to a documented, signed-off handover. One team carries all of it: a single point of accountability from first drawing to opening night.
Yes. On new builds and major refurbishments we deliver the stage-engineering package within the builder's programme, with drafting, design-review milestones and documentation aligned to construction milestones. We coordinate and document the interfaces with building services and other trades, so the stage systems land as one accountable package, not loose subcontracts.
The sequence changes; the standard does not. A new build runs inside a construction programme, with systems coordinated against the building design from the start. A retrofit starts with what the existing structure can carry and what the calendar allows. We engineer around both, and a working venue can usually keep operating while the fit-out is staged around it.
We do. Scenic, rigging, automation, drapes and electronics all sit within one organisation, so the interfaces are engineered together, not negotiated between vendors on site. We carry and document coordination with lighting, audio, video and building trades, so no gap in the building is left without an owner.
At handover you receive:
  • Structured documentation of the installed systems
  • Operators trained to competency on the specific equipment they will run
Hoist and rigging systems should then be serviced and maintained every 12 months, and most venues carry that through a TSA Service & Inspection Programme, with a Venue Systems Health Check as the periodic whole-of-systems review. The team that installed the environment is the team that maintains it.
An installation is a defined system going into a venue (a hoist package, a grid, a track system), installed, load-tested and commissioned. A fit-out is the whole staging environment as one engagement, from design coordination across every discipline to commissioning and handover. One system? Start at our installation service. Delivering or transforming a building? Start here.
Fit-out to commission

One building.
One team.

Tell us about the building - a new-build PAC, a retrofit refurbishment or a single space that needs to work harder. An engineer who delivers venue fit-outs will come straight back with how we would carry it.

See our installs →
  • We coordinate. Load paths and interfaces resolved on paper.
  • We design. The staging environment as one system.
  • We commission. Signed off, documented, operators trained.