Venue fit-outs and refurbishments - the whole staging environment designed, installed and commissioned by one team, Australia wide
Every system. Every interface. One team.
A venue fit-out from TSA is the whole staging environment - rigging, drapes and track, automation and electronics - installed and commissioned by one team, then handed over documented and signed off. One number to call, not multiple vendors to coordinate.
Start where
the building is.
A fit-out rarely starts from a clean sheet. Tell us where the building is - on the drawing board, half-built or mid-season - and we plug the programme in from there.

A new-build PAC
- Design stage
- Inside the construction programme
We come in alongside your architect and head contractor from design stage, delivering the stage-engineering package inside the construction programme.

A retrofit refurbishment
- Around your season
- Calendar keeps running
A working venue kept working - the install sequenced around your season so the systems change without the calendar stopping.

A single-space upgrade
- One space
- Same standard
One studio, hall or stage inside a larger building, brought to the same engineered, documented, signed-off standard.

Fit-out to commission,
one team.
A venue fit-out is the whole staging environment, designed, supplied, installed and commissioned by one team, then handed over documented and signed off. It is built for the people responsible for a building, not a show.
What a fit-out covers
- Rigging and pipe grids
- Drapes and track
- Automation and control
- The electronics behind them
Brought in-house over a decade
- Track and drape installation
- Automation
- Electronics design
- Scenic fabrication
- Drape manufacturing
One party carries every system and every interface, so design intent survives from concept to commissioning with one accountable party. Load paths, interfaces and structural requirements are coordinated early, on paper, not discovered on site.
Venue managers, capital-works leads, architects and tier-one head contractors delivering a new performing arts centre or refurbishing a working venue.
Venue Engineering & Installation
Exactly what you asked for, ceiling to floor.
Four things a fit-out actually buys you - on the night the building opens, through the season after it, and ten years on.
It works on night one
Every axis load-tested, every cue proved, the room signed off before an audience is in it.
Your season keeps running
The install is sequenced around the calendar you have already published.
Built exactly as approved
Grid, hoists, track, drapes, control and the electronics behind them are drawn as one system, so the design you signed off is the room you walk into.
Still yours in year ten
Duty cycle, service access and spares are engineered in from concept, your operators are trained to competency at handover, and the documentation lands in a form the next venue manager can pick up and run.
Fit-out to commission.
Every fit-out runs the same documented programme, new-build PAC or working venue. Here is how a brief becomes a commissioned, signed-off staging environment.
-
Phase 01
Early coordination
Load paths, interfaces and structural requirements resolved on paper with the architect, engineer and builder - not on site.
-
Phase 02
Informed design
The staging environment designed as one system, with scenic and layout decisions shaped by automation and rigging constraints.
-
Phase 03
Drafting & design review
In-house drafting, formal design-review milestones before fabrication - load-bearing elements verified and certified by engineering.
-
Phase 04
Fabrication & install
Controlled fabrication under quality-assurance oversight, then installed and integrated on site by the team that engineered it.
-
Phase 05
Commission & handover
Commissioned, signed off and handed over with structured documentation - and operators trained to competency on the systems they now own.




What a fit-out
installs.
Grid, drapes, control and the electronics behind them, drawn and installed as one system. Select a numbered pin to see where each sits in the room.

Fit-out to commission, one team.
Venue rig in place Line arrays, grid and drapes over a tiered house

A Great Hall that takes whatever walks in
Integrated overhead systems above a convention-centre stage, designed, installed and commissioned by one team.
Read the case study →Fit-outs,
delivered.
From a multi-studio broadcast facility to integrated overhead systems above convention-centre stages - one team designs the environment, installs it and stands behind it.
See all projects
A Great Hall that takes whatever walks in.
A 36-axis chain-hoist array and 42 metres of box truss, installed and commissioned over the Great Hall.
Read the project
Installed once. 4,000 shows.
Seven-plus years of shows on the staging and automation TSA installed - the long-run standard in practice.
Read the project
Every discipline, one build.
Hard set, set electrics and soft goods carried under one party - the integrated model a fit-out runs on.
Read the projectTell us about the building.
Venues, fitted out and ready.
Drapes, tracks and seating fitted into halls, theatres and auditoriums.
Questions
about venue fit-outs.
If your question isn't here, talk to our team and we'll come back with the right answer for your building.
Call 1300 439 872 →- Rigging, hoists and grids
- Drapes and track
- Automation and control
- The electronics behind them
- Structured documentation of the installed systems
- Operators trained to competency on the specific equipment they will run
One building.
One team.
Tell us about the building - a new-build PAC, a retrofit refurbishment or a single space that needs to work harder. An engineer who delivers venue fit-outs will come straight back with how we would carry it.
- We coordinate. Load paths and interfaces resolved on paper.
- We design. The staging environment as one system.
- We commission. Signed off, documented, operators trained.