01 - What We Do

Eight capabilities. One TSA.

Case study Built 2026
Museums & Galleries

ACMI Lifelike: a 5 metre arcade of arches, built as exhibition scenery and stood in a week.

Three tiers of CNC-cut MDF arches, 5120 mm high and 6300 mm wide, with Corinthian capitals and a globe over every arch. Built in modules, stood and painted in ACMI's basement gallery by a crew of four, with the Shadow Puppets plinth and The Sting framing alongside.

Location
Melbourne, Victoria
Years
2026
TSA Teams
Exhibitions & Interactives · Museum & Gallery Fit-out · Sets & Scenery
Scroll
At a glance
01 Client

ACMI, via head builder Aspyer

02 Challenge

A three-tier arcade, part photo spot and part projection screen, to stand in a live museum inside a two-week builder window.

03 What we did

CNC-cut MDF modules on LVL columns and stud frames, with every light reachable behind a removable fascia, plus the Shadow Puppets plinth and The Sting framing.

04 Outcome

Stood, painted and lit in a week on site, four weeks before Lifelike opened on 20 November.

01 The Problem

Five metres of arches, in a museum that never closed.

Lifelike is ACMI's world-premiere exhibition on screen puppetry, from Pinocchio to The Dark Crystal, open 20 November 2026 to 18 April 2027. Anita Gigi Design drew a three-tier arcade for one wall of Gallery 4, known on the drawings as the Muppet Arches: 5120 mm high, 6300 mm wide, with a walk-in bottom row for photos and upper arches that double as projection screens.

ACMI stays open to the public through every build, so noisy work happens before 9.30 am, and the head builder, Aspyer, had two weeks on site for the whole gallery. The arcade had to arrive ready to stand, not ready to build.

Bottom row of pink arches standing in Gallery 4 with bare timber stud frames above, access platforms and barrier tape in front. Design: Anita Gigi Design for ACMI. Photo: TSA.
The bottom row standing in Gallery 4, with the stud frames up above it.
02 The Process

Drawn as a kit, stood in three steps.

i
Timber stud frames standing on the finished bottom row of pink arches during the install. Design: Anita Gigi Design for ACMI. Photo: TSA.

Engineered as modules

The arcade breaks down into five composite columns on LVL cores, mirrored left and right bottom-row arch units, three MPG10 stud frames and the upper arch panels, all in 12 mm CNC-cut MDF. The bottom-row soffits are three layers of 9 mm kerf MDF bent over 16 mm formers, and the Corinthian capitals are 3D printed to the designer's three profiles. The project's structural engineer checked the drawings before cutting.

ii
Globe lampholder fitted through a curved pink MDF fascia. Photo: TSA.

Built for the lighting crew

The lighting is by others, so the arches were built around it. A slot routed into each bottom soffit takes an LED strip. Every globe sits behind one of 21 removable 6 mm fascias, fixed with painted screw covers. LED drivers sit behind an access hatch in the left return, and each column has a rear panel for its floor fixings.

iii
Upper rows of arches clad and the white infill panels fitted, with access platforms still in place. Design: Anita Gigi Design for ACMI. Photo: TSA.

Stood in three steps

Columns spigot into the bottom arches, are levelled and fixed to the floor. The stud frames lift onto the bottom structure and tie back to timber slats on the gallery wall. The middle and top rows screw on, then the joints are filled and sanded. A crew of four did it in a week, with most of the painting done on site in three Dulux low-VOC pinks so the finish runs unbroken across every joint.

03 The Result

Standing, painted and lit inside a week.

The arcade was standing, painted and lit by 23 October 2026, ready for ACMI's projection, AV and graphics ahead of the 20 November opening. The Shadow Puppets plinth, an L-shaped base with four risers built to take two people standing while the artworks went in, and The Sting framing went in on the same programme.

It is our second build at ACMI. Show Works (now TSA) built showcases, plinths and furniture for The Story of the Moving Image. Design: Anita Gigi Design for ACMI. Photography: TSA.

Teams on this job

Engineered, installed, supported.
Under one roof.

Talk to us

Got a project that has to land first time?

Scenery that has to stand up, light up and come apart again. If your next exhibition has a feature wall like this one, talk to us before it goes to tender.